Phone : 603-92821155
Fax : 603-92857789
Email :services@klconsult.com.my

Feasibility Study

Year Client Area of Operation Associates Brief Description of Works
1981 Urban Development Authority Malaysia Seremban railway land development To determine the optimal commercial use of urban railway land considering long term infrastructural needs.
1983 Malayan Railway Freight market share study Perunding Bersatu, Malaysia To increase Malayan Railway’s freight market share.
1985 Malayan Railway Modernisation of Signalling system  Pacific Consultants, Tokyo To modernise signalling and communication facilities to cope with increased traffic.
1987 Government of Austria Rationalisation of Malayan Railway track maintenance practices Austria Rail Engineering To rationalise Malayan Railway track maintenance practices.
1989 Economic Planning Unit, Prime Minister’s Department Relocation of railway station and yard at Gua Musang, Kelantan To stimulate effective of railway on the growth of the town.
1995 Tasek Corporation Berhad Gunong Kuang, Ipoh, Perak Feasibility study for transport of raw limestone from quarry to Tasek by rail.
1997-2000 Government of Malaysia Singapore - Kunming Rail Link
Singapore, Malaysia, Thailand, Cambodia, Vietnam, Laos, Myanmar, China
Jurutera Perunding Zaaba Sdn. Bhd. Engineering technical and economic study of various routes and existing network
1999 Ministry of Finance
Government of Malaysia
STAR LRT, Kuala Lumpur Nichols Associates Review of Capital Costs of STAR LRT.
2002 Government of Malaysia Seremban – Johor Bahru– Tg. Pagar Preliminary engineering and route alignment study for the proposed double tracking project
2002 Government of Malaysia Seremban – Johor Bahru To prepare Statement of Needs for the proposed double tracking project
2006 KTMB Malaysia Consultancy services for the preparation of a bridge manual for railway bridges, arches, tunnels and culverts.
2010 HSSI Integrated Sdn. Bhd. East Coast, Malaysia Feasibility study for the proposed East Coast Rail Route
2012 Ministry of Transport Government Malaysia Johor Bahru Study for Electrified Double Track and High Speed (HSR) project between Kempas - JB Sentral Railway Corridor

Copyright © rights reserved 2012 www.klconsult.com